(1).You are suggested to pre-lay tiles to decide the tiling place and stripes
orientation.
(2).Make sure the surface of pavement area is flat and level.
(3).Clear tiles surface duly after tiling
(4).It's strongly suggested to keep laid area out of stress touch four to five
days to ensure surface even. |